Correct preparation for Shower Pan Hot Mopping is as
follows:
Solid wood blocking, In between studs, around the
base of the shower, 12 inches minimum in height
Dam height must be a minimum of 4 1/2 inches
A two-part hot mop drain is required
Bottom flange of shower pan drain MUST BE FLUSH WITH
THE FLOOR
If the shower has a seat / bench or tub ledge, it
must be covered with plywood on the top and front and sides.
Blocking must extend 4 inches above the seat.
Shower Pan Installation Process:
Shower pans are pre-sloped 1/4 inch per foot, with
mortar mix cement. Each shower pan is installed with three
layers of 15 lb, perforated felt which is HOT MOPPED between each
layer. Fiberglass mesh is installed in all corners and
at all paper seams. After which a top coat of tar is added.
hot mop shower pans
in southern California, hot mop shower pans in San Diego, hot mop
shower pans in orange county, hot mop shower pans services in orange
county, hot mop shower pans and roman tubs services in southern
California and orange county, shower repairs in orange county, hot
mop shower pans in Los Angeles